for Pipe Range | 200-3000mm |
---|---|
Material | hdpe |
Application | Pipeline Joint Closure |
Application Area | HDPE Hollow Wall Spiral Pipes |
Verpackung Informationen | Plastikfilm und Holzetui |
Material | HDPE |
---|---|
Application | Pipeline Joint Closure |
Connection | Welding |
Verpackung Informationen | Plastikfilm und Holzetui |
Lieferzeit | 60 Tage |
Application Area | Directly buried metal reinforced corrugated pipes |
---|---|
Connection | Welding |
Material | HDPE |
Verpackung Informationen | Plastikfilm und Holzetui |
Lieferzeit | 60 Tage |
Material | Plastic |
---|---|
Application | Pipeline Joint Closure |
Connection | Welding |
Application Area | Directly Buried Pre-Insulated Pipe |
Verpackung Informationen | Plastikfilm und Holzetui |
Thickness | 2-16mm |
---|---|
Connection | Welding |
Application | Pipeline Joint Closure |
Verpackung Informationen | Standardverpackung |
Lieferzeit | 60 Tage |
Material | HDPE |
---|---|
Application | Pipeline Joint Closure |
Application Area | Directly Buried Pre-Insulated Pipe |
Verpackung Informationen | Plastikfilm und Holzetui |
Lieferzeit | 60 Tage |
Connection | Welding |
---|---|
Material | HDPE |
Tensile Yield Strength | 19 |
Application | Pipeline Joint Closure |
Verpackung Informationen | Plastikfilm und Holzetui |
Material | HDPE |
---|---|
Application | Pipeline Joint Closure |
Application Area | Directly Buried Pre-Insulated Pipe |
Verpackung Informationen | Plastikfilm und Holzetui |
Lieferzeit | 60 Tage |
Application Area | Pre-Insulated & Oil Pipe |
---|---|
Material | hdpe |
Thickness | 2-16mm |
Connection | Welding |
Verpackung Informationen | Plastikfilm und Holzetui |